LMS Gym Roof
|
The Langley Middle School gym roof was in poor shape and began
leaking. It was replaced summer 2014.
|
|
HS
Track Resurfacing
|
The
South Whidbey High School track had been in poor shape for several
years. Delamination and other safety concerns has prevented
track competitions from being held at the high school.
The old track surface was removed and recycled. The surface
prepared and a new polyurethane track surface applied. The long
jump events were also moved off of the infield. This work was
completed summer 2014.
|
 |
Elementary
Carpet
|
This
project completed the classroom carpeting efforts which started
several years ago. This work was done summer 2014.
Hallway and office carpeting will complete this project in coming
years.
|
 |
School
Entrance Security
|
Entrance
security devices were installed at the HS, LMS and Elem sites.
These devices allow school staff to manage front door access from
inside the office area. They would be used during lockdown
events or at times of increased safety concern.
|
 |
LMS Field Restoration
|
The
main field at the Langley Middle School has had serious drainage and
settling issues for many years. Only half the field was usable
and athletic games could not be played on the surface. This
project identified and repaired the damaged drainage system, filled
settled areas, graded and seeded the south west section of the
field. Work completed summer 2014.
|
 |
Fencing
Projects
|
Several
fencing projects were completed including new fencing at the
kindergarden playground to meet health and safety standards,
perimeter fencing for the middle school, access gates at the high
school and water plant.
|
 |
LMS Track Restoration
|
The
Langley Middle School track has a basic crushed rock surface.
Grass and weeds had taken over the surface, leaving little more than
a trail around the track. This projected scraped off the grass,
added new crush rock material and graded/compacted the surface.
|
 |
HS Field Restoration
|
The condition of the main field at the HS had declined over the years. Through a combination of top-dressing, aerating, reseeding, irrigation improvements and soil conditioning, the turf was brought back to a healthy condition.
|
 |
Other Projects
|
A variety of other projects were completed this year, including:
LMS cafeteria flooring; new washer and dryer for LMS and Elementary schools; classroom whiteboards and other furnishings; new doors and locks; improved outside lighting; a variety of HVAC improvements; new kitchen equipment; new risers for septic system at south campus site; new fire monitoring system for Bayview School; new eyewash station for HS shop areas; new hot water tanks; new dumpster pad for LMS site.
|